Cameco | Surface Freeze Brine Distribution

download.png
Surface Freeze Brine Distribution1.png
Surface Freeze Brine Distribution2.png

Client: Cameco, Cigar Lake Mine

Duration of the Work: 49 days

Area of Work: General Construction- Mechanical, Piping, Electrical, Instrumentation

Comments: Supplied and Installed prefabricated and pre-insulated supply and return Freeze Brine Distribution Lines.

Insulated all the hoses, pipes, and fittings.

Supplied and Installed prefabricated flexible hydraulic hoses with termination fittings.

Hydro-tested and Commissioned the Brine Lines.