Cameco | Surface Freeze Brine Distribution
Client: Cameco, Cigar Lake Mine
Duration of the Work: 49 days
Area of Work: General Construction- Mechanical, Piping, Electrical, Instrumentation
Comments: Supplied and Installed prefabricated and pre-insulated supply and return Freeze Brine Distribution Lines.
Insulated all the hoses, pipes, and fittings.
Supplied and Installed prefabricated flexible hydraulic hoses with termination fittings.
Hydro-tested and Commissioned the Brine Lines.