Tron C&M LP has been awarded the Denison Mines FFT Separation Phase project.

Tron C&M LP has been awarded the Denison Mines FFT Separation Phase project. 

Project Background:

Provision of comprehensive mechanical and electrical services for the field installation and maintenance of the separation phase in the in-situ-recovery mining method at Denison's Phoenix deposit in Wheeler River.

Expected Project Timeline: Q2 2023

Scope:

Mechanical

  • Thickener Overflow Tank Pump Replacement.

  • Piping connection for the Recovered Solution Tank Transfer Pump.

  • Installation of a Herman-Nelson heater on the storage tank door.

  • Thickener pump piping and support modifications.

  • Trouble shoot the Thickener agitator.

  • Separation Phase piping and hose connections.

  • Fabricate cover for sampling well head.

Electrical

  • Electrical wiring and connection for the Recovered Solution Tank Transfer Pump.

  • Verify rotations of agitators and pumps.

  • Mount PH and ORP probes in 5 tanks.

  • All necessary cable pulling and termination for the heater power connection to the E-house.

  • All necessary cable pulling and termination for the heater feeds, connecting them from the Junction box to the main Control Panel.

  • conduct cable and equipment testing, including megger testing, to ensure proper functionality and performance.

  • All necessary cable pulling and termination for the instrument cabling related to temperature sensors and control for the heater.