Notification of Award - Denison Mines FFT Separation Phase
Tron C&M LP has been awarded the Denison Mines FFT Separation Phase project.
Tron C&M LP has been awarded the Denison Mines FFT Separation Phase project.
Project Background:
Provision of comprehensive mechanical and electrical services for the field installation and maintenance of the separation phase in the in-situ-recovery mining method at Denison's Phoenix deposit in Wheeler River.
Expected Project Timeline: Q2 2023
Scope:
Mechanical
Thickener Overflow Tank Pump Replacement.
Piping connection for the Recovered Solution Tank Transfer Pump.
Installation of a Herman-Nelson heater on the storage tank door.
Thickener pump piping and support modifications.
Trouble shoot the Thickener agitator.
Separation Phase piping and hose connections.
Fabricate cover for sampling well head.
Electrical
Electrical wiring and connection for the Recovered Solution Tank Transfer Pump.
Verify rotations of agitators and pumps.
Mount PH and ORP probes in 5 tanks.
All necessary cable pulling and termination for the heater power connection to the E-house.
All necessary cable pulling and termination for the heater feeds, connecting them from the Junction box to the main Control Panel.
conduct cable and equipment testing, including megger testing, to ensure proper functionality and performance.
All necessary cable pulling and termination for the instrument cabling related to temperature sensors and control for the heater.